projectheader.jpg - 10563 Bytes
spacer.jpg - 586 Byteshome.jpg - 968 Bytesretrofit.jpg - 1999 Byteswhy.jpg - 1667 Bytescapabilities.jpg - 1321 Byteshow.jpg - 1465 Bytesawards.jpg - 1068 Bytescontactus.jpg - 1268 Bytes
calaveraslarge.jpg - 81932 Bytes The program met the county's technical, financial and procurement requirements resulting in a comprehensive program that included:

  • Complete lighting system renovations.
  • Heating, ventilation and air conditioning system replacement
    . . .and retrofits.
  • Upgrades and enhancements to the county's existing direct
    . . . digital control (DDC) systems.
  • T-bar ceiling replacement.
  • Asbestos, lead and PCB abatement.
  • Air conditioning of the 911 dispatch center.
  • returntotopbutton.jpg - 1617 Bytes
    Calaveras County

    In 2004 Calaveras County chose Aircon Energy to design and build the renovation of the administration building and government center plant. The project was a collaborative effort that produced a custom tailored solution to fit the specific needs of the facility. In addition to the operational and comfort improvements that were realized, hazardous materials such as asbestos and PCBs were eliminated to help the county establish a safer work environment.

    Client
    County of Calaveras
    891 Mountain Ranch Road
    San Andreas, CA

    Contact
    Tom Mitchell
    County Administrative Officer

    Projected Cost
    $648,000

    Rebate
    $6,400

    Projected Annual Savings
    $63,524

    Payback Period
    10.1 years

    Financing Arrangements
    Self Funded
    bottomheader.jpg - 5499 Bytes